Operation Guide of Horizontal Directional Drilling Machine
Time: 2025-02-13 09:49:57

The horizontal directional drilling machine is an advanced trenchless construction equipment that is widely used in underground pipelines, cable, and other laying projects. It can efficiently complete underground construction tasks without damaging ground facilities, significantly improving construction efficiency and safety. It is suitable for municipal engineering, oil and gas pipeline laying, communication cable installation, and other fields. This equipment achieves precise drilling through an integrated guidance system and power system and adapts to various geological conditions, from soft soil to hard rock. The following are its detailed operation steps:


Horizontal-Directional-Drilling-Machine-News


(I) Pre-construction preparation
1. Equipment inspection:
Before use, the drilling rig body, propulsion system, directional control system, etc., need to be fully inspected to ensure the normal operation of all components.
2. Drilling tool selection and assembly:
According to specific construction requirements, select suitable drill bits and drill rods and complete their assembly and connection.
3. Hydraulic system preparation:
Make sure that the hydraulic pump station is filled with enough hydraulic oil, and check whether the hydraulic oil pipe is unobstructed.


Horizontal-Directional-Drilling-Machine-News1


(II) Drilling rig installation and commissioning
1. Drilling rig installation:
Place the drilling rig at the predetermined drilling position, adjust the drilling rig to a horizontal state, and connect the cooling water pipe and cable.
2. Trial operation:
Start the hydraulic pump station to test whether the rotation and push-pull action of the drilling rig are normal. If any problems are found, check the motor rotation direction and the connection of the hydraulic oil pipe to ensure that everything is normal.


Horizontal-Directional-Drilling-Machine-News3


(III) Construction process
1. Drilling positioning:
Use an advanced guidance system to determine the drilling trajectory and drill from the starting point A to the end point B. The application of the guidance system makes the drilling path more precise and controllable.
2. Hole expansion operation:
After the drilling is completed, replace the reamer from endpoint B and gradually pull back to expand the hole until the hole diameter reaches the expected size. This step ensures the smooth laying of subsequent pipelines or cables.
3. Pipeline laying:
After the hole expansion is completed, pull the pipeline fromstartingg point A to endpoint B to complete the laying process.
If you are interested in horizontal directional drilling rigs or need more information, please feel free to contact us. Yugong Machinery looks forward to providing you with professional consultation and support.

Contact Us
Mobile:
+8613838270129
Whatsapp:
Get A Free Quote
© Yugong Machinery Co., Ltd.. All rights reserved.
We use cookies to offer you a better browsing experience, analyze site traffic and Accept personalize content. By using this site, you agree to our use of cookies.
Yes, I agree
We use cookies to personalize and enhance your browsing experience on our website. By continuing to use this website, you agree to the terms outlined in our Privacy Policy, For further information, please consult our Privacy Policy.
Yes, I agree